top of page
sunlight kitchen (1).jpg

SUNLIGHT STREET, KENSINGTON, L6 – PROPERTY INVESTMENT CASE STUDY

A hands-free Liverpool buy-to-let in Kensington, L6, with a light refurb completed in 2 weeks and a tenant secured within 3 weeks of works finishing.

QUICK LOOK BUY-TO-LET PHOTOS

Living room with bay windows, wood-effect flooring, radiator and ceiling pendant light.

After

Living room wall detail showing wood-effect flooring with skirting removed and pipework exposed along the base.

Before​

DEAL OVERVIEW

REFURBISHMENT

SUMMARY

  • Fully Managed Refurb Cost (Inc VAT): £7,753

  • Duration: 2 weeks

SCOPE OF WORKS

  • General maintenance repairs throughout property and yard

  • Damp proofing works to internal and external walls. 10 year gurantee.

  • Safety certification, roof ventilation, energy assessment

WHY WE KEPT IT LIGHT

We target properties that only need light refurb, as this keeps risk lower, costs more predictable, and projects moving quickly. The quicker turnaround helps get tenants in sooner and rental income started earlier.

COST BREAKDOWN

Deal Details
Figures
Mortgage Deposit

£24,375

Fully Managed Refurb Cost (Inc VAT)

£7,753

Buying Costs

£14,370

Total Cash Required

£46,498

TIMELINE

We handled the moving parts throughout, with minimal input from the investor.

  1. Pre-offer checks: street selection, comparables, letting agent rent sense-check, refurb estimate

  2. Offer agreed and terms locked in

  3. Purchase progressed: conveyancing opened, lender valuation booked

  4. Surveys and checks completed, final refurb scope confirmed

  5. Keys received

  6. Light refurb completed (2 weeks)

  7. Lettings: marketed in advance, tenant moved in within 3 weeks of works finishing

  8. Management live: from tenant move-in

CLIENT OUTCOME

WHAT THE INVESTOR WANTED

Plan B income from a Liverpool buy-to-let, without refurb stress, choice overload, or this turning into a second job.

WHAT HAPPENED

  • Light refurb completed in 2 weeks

  • Tenant secured within 3 weeks of completing refurb

  • Fully managed from day one, investor did not need to visit

  • The result: one more asset doing its job quietly in the background while they focus on work and family

Deal Details
Figures
Purchase Price

£97,500

Year Purchased

2025

Refurb Cost

£7,753

Annual Rent

£8,400 (£700 pcm)

Gross Yield

8.6%

Total Cash Required

£46,498

Projected 5-Year Growth

£41,000*

*Based on UK average growth since 1980 (ONS). Illustration only.

WHY THIS PROPERTY INVESTMENT DEAL WORKED

The right house on the right street, with light works, set up to be low maintenance.

  • Strong rental demand in Kensington, L6

  • Quick turnaround to cashflow

  • Fully hands-free for the investor

CHECKS WE DID (AND WHAT WE FIXED)

  • Minor damp readings flagged - report ordered, works scoped and completed during refurb

  • Rent level sense-checked with letting agent - priced correctly, let quickly

BEFORE AND AFTER GALLERY

Living Room

After

Before​

Living room with bay windows, wood-effect flooring, radiator and ceiling pendant light.
Living room wall detail showing wood-effect flooring with skirting removed and pipework exposed along the base.

Front reception room finished with new skirting and fresh decoration. - damaged lower wall sections were opened up, made good and replastered.

Bedroom

After

Before​

Newly refurbished bedroom with freshly painted white walls and ceiling, new dark grey carpet, and a large window letting in natural light. A single bare bulb hangs from the ceiling, and the room is empty and clean.
Mid-renovation with bare plastered walls showing patch repairs, unfinished flooring, and renovation materials on the floor (buckets, plaster, tools, and boards). A bare bulb fitting hangs from the ceiling and the room appears dusty and incomplete.

Bedroom fully refurbished - walls prepared and replastered, ceiling made good, new carpet fitted, and complete redecoration carried out to create a clean, modern finish.

Back Yard

After

Before​

Small paved rear yard with cream painted brick walls, a black gate and a round manhole cover.
Paved rear yard with cream painted brick walls, a black gate and areas of moss or algae on the concrete.

Rear yard refreshed - walls cleaned and treated, masonry repainted, and surface cleared to create a tidy, low-maintenance outdoor space.

Before and After

WANT RESULTS LIKE THIS?

If you want a boring, predictable Liverpool buy-to-let set up fully managed, book a call and we’ll map out the right next step.

DISCLAIMER

Info only, not advice. Figures are accurate at the time of purchase. “Projected 5-Year Growth” is an assumption-based illustration (ONS), not guaranteed. Values, rents and returns can rise or fall.

  • Logo of LinkedIn
  • facebook
  • Logo of Youtube
  • Logo of Instagram
  • Threads
  • Logo of X
  • Logo Pinterest
  • Logo of Tiktok
  • Logo of Google
  • Logo of WhatsApp

Legal

Privacy Policy

Total Property Group: Liverpool Property Sourcing. All rights reserved.
Registered in England and Wales as TPG Trading Limited.

Company Registration Number: 12571193.

Registered Office: Unit 5 Marlborough Road, Wrexham Industrial Estate, Wrexham, United Kingdom, LL13 9RJ.

VAT Registration Number: 438231013.

We are not financial advisers. All content on this site is for general information and educational purposes only. Property investments carry risks, and past performance is not a guarantee of future results.

bottom of page