top of page
sunlight kitchen (1).jpg

SUNLIGHT STREET, KENSINGTON, L6 – PROPERTY INVESTMENT CASE STUDY

This Liverpool property investment case study shows how we sourced and fully managed a 2-bed buy-to-let in Kensington, L6, bought for £97,500, refurbished for £7,753, and let at £700 pcm.

QUICK LOOK BUY-TO-LET PHOTOS

Living room with bay windows, wood-effect flooring, radiator and ceiling pendant light.

After

Living room wall detail showing wood-effect flooring with skirting removed and pipework exposed along the base.

Before​

DEAL OVERVIEW

*Based on UK average growth since 1980 (ONS). Illustration only.

COST BREAKDOWN

Deal Details
Figures
Mortgage Deposit

£24,375

Fully Managed Refurb Cost (Inc VAT)

£7,753

Buying Costs

£14,370

Total Cash Required

£46,498

REFURBISHMENT

SUMMARY

  • Fully Managed Refurb Cost (Inc VAT): £7,753

  • Duration: 2 weeks

SCOPE OF WORKS

  • General maintenance repairs throughout property and yard

  • Damp proofing works to internal and external walls. 10 year guarantee.

  • Safety certification, roof ventilation, energy assessment

WHY WE KEPT IT LIGHT

We target properties that only need light refurb, as this keeps risk lower, costs more predictable, and projects moving quickly. The quicker turnaround helps get tenants in sooner and rental income started earlier.

TIMELINE

We handled the moving parts throughout, with minimal input from the investor.

  1. Pre-offer checks: street selection, comparables, letting agent rent sense-check, refurb estimate

  2. Offer agreed and terms locked in

  3. Purchase progressed: conveyancing opened, lender valuation booked

  4. Surveys and checks completed, final refurb scope confirmed

  5. Keys received

  6. Light refurb completed (2 weeks)

  7. Lettings: marketed in advance, tenant moved in within 3 weeks of works finishing

  8. Management live: from tenant move-in

CLIENT OUTCOME

WHAT THE INVESTOR WANTED

Plan B income from a Liverpool buy-to-let, without refurb stress, choice overload, or this turning into a second job.

WHAT HAPPENED

  • Light refurb completed in 2 weeks

  • Tenant secured within 3 weeks of completing refurb

  • Fully managed from day one, investor did not need to visit

  • The result: one more asset doing its job quietly in the background while they focus on work and family

Deal Details
Figures
Property Type

2 Bed, Mid Terraced House

Purchase Price

£97,500

Year Purchased

2025

Refurb Cost

£7,753

Annual Rent

£8,400 (£700 pcm)

Gross Yield

8.6%

Total Cash Required

£46,498

Projected 5-Year Growth

£41,000*

WHY THIS PROPERTY INVESTMENT DEAL WORKED

The right house on the right street, with light works, set up to be low maintenance.

  • Strong rental demand in Kensington, L6

  • Quick turnaround to cashflow

  • Fully hands-free for the investor

CHECKS WE DID (AND WHAT WE FIXED)

  • Minor damp readings flagged - report ordered, works scoped and completed during refurb

  • Rent level sense-checked with letting agent - priced correctly, let quickly

BEFORE AND AFTER GALLERY

Living Room

After

Before​

Living room with bay windows, wood-effect flooring, radiator and ceiling pendant light.
Living room wall detail showing wood-effect flooring with skirting removed and pipework exposed along the base.

Front reception room damp treatment completed - the wall was injected with DPC cream and comes with a 10-year guarantee, helping prevent recurring damp issues and protect the property’s long-term condition.

Bedroom

After

Before​

Newly refurbished bedroom with freshly painted white walls and ceiling, new dark grey carpet, and a large window letting in natural light. A single bare bulb hangs from the ceiling, and the room is empty and clean.
Mid-renovation with bare plastered walls showing patch repairs, unfinished flooring, and renovation materials on the floor (buckets, plaster, tools, and boards). A bare bulb fitting hangs from the ceiling and the room appears dusty and incomplete.

Bedroom fully refurbished - walls prepared and replastered, ceiling made good, new carpet fitted, and complete redecoration carried out to create a clean, modern finish.

Back Yard

After

Before​

Small paved rear yard with cream painted brick walls, a black gate and a round manhole cover.
Paved rear yard with cream painted brick walls, a black gate and areas of moss or algae on the concrete.

Rear yard refreshed - walls were cleaned and treated, masonry was repainted, and the area was cleared to create a tidy, low-maintenance outdoor space that improves tenant appeal and reduces ongoing upkeep.

Before and After

WANT RESULTS LIKE THIS?

If you want a boring, predictable Liverpool buy-to-let set up fully managed, book a call and we’ll map out the right next step.

DISCLAIMER

Info only, not advice. Figures are accurate at the time of purchase. “Projected 5-Year Growth” is an assumption-based illustration (ONS), not guaranteed. Values, rents and returns can rise or fall.

  • Logo of LinkedIn
  • facebook
  • Logo of Youtube
  • Logo of Instagram
  • Threads
  • Logo of X
  • Logo Pinterest
  • Logo of Tiktok
  • Logo of Google
  • Logo of WhatsApp

Total Property Group is a trading name of TPG Trading Limited (Company No. 12571193), registered in England and Wales.
We are not and have never been affiliated with Total Property Group Ltd.

Registered Office: Unit 5 Marlborough Road, Wrexham Industrial Estate, Wrexham, United Kingdom, LL13 9RJ
VAT Number: 438231013
Companies House: View TPG Trading Limited on Companies House
Compliance & Consumer Protection: View our Compliance & Consumer Protection page
Privacy Policy: View our Privacy Policy
Complaints Procedure: View our Complaints Procedure

We are not financial advisers. All content on this website is provided for general information and educational purposes only and does not constitute financial, investment, legal or tax advice. Property investment carries risk, and past performance is not a reliable indicator of future results.

bottom of page